Showing posts with label Namma Metro. Show all posts
Showing posts with label Namma Metro. Show all posts

Tuesday, August 7, 2012

On Bengaluru Metro & Delhi's Airport Line

Though the following two problems are not directly related to Hyderabad, we are posting them because of the their relevance to the issue of metro projects in India --CR

Metro medians turn garbage dumps
Sunitha Rao R, TNN | Aug 6, 2012, 04.01AM IST
BANGALORE: Garbage contractors appear determined to ruin the city's aesthetics. Under pressure to find space to dump waste, they have begun offloading debris in medians between Namma Metro pillars. What was planned to be a colourful bed of flowers has become home for stinking heaps of garbage all along Reach 1 on the MG Road-Byappanahalli route.
http://timesofindia.indiatimes.com/city/bangalore/Metro-medians-turn-garbage-dumps/articleshow/15369170.cms

Did DMRC compromise on airport metro line safety? 
Sandeep Kumar, IBN7
New Delhi: The government-run Research Design and Standards Organisation (RDSO) has filed a report that exposes how the Delhi Metro Rail Corporation (DMRC) and Reliance Infra overlooked serious technical problems in the India’s first airport metro service.
The RDSO's report accessed by IBN 7 shows how the airport metro ran on broken clips for eight months. The report says 11,000 clips found broken on the IGI airport-Shivaji Stadium track.
The RDSO says the DMRC did not reply despite reminders. For more, click the following link-
http://ibnlive.in.com/news/did-dmrc-compromise-on-airport-metro-line-safety/279283-3-244.html


Thursday, November 3, 2011

Bangalore metro - Truth comes out after the hype subsides


Bangalore's Namma Metro was launched in stretch of 7km or so with a lot of hype on 20th October, 2011. Now the metro seems to be running with empty coaches and the feeder buses are also going to be withdrawn. The MD of BMTC talks of reintroducing them once Phase 1 works are over. As per the present schedule of the Namma Metro, the phase 1 is likely to be completed only in 2014. So, till then, keep running the metros as toy trains? - CR

BMTC to phase out Metro feeder services?
Shyam Sundar Vattam, Express News Service, 03 Nov 2011
BANGALORE: The Bangalore Metropolitan Transport Corporation (BMTC) plans to gradually phase out feeder services to the ‘Namma Metro’ temporarily due to lack of patronage. The corporation may re-introduce the feeder services once Phase 1 works are completed. The BMTC, before the inauguration of Metro train services, had deployed a fleet of buses to cater to the demands of commuters. But now it is finding difficult to run the service as not more than 2 or 3 commuters travel in each bus even during peak hours. More than the cost, the BMTC feels, it is not viable to run the buses empty even in busy hours.

“The corporation does not mind running feeder buses even if there are 15-16 passengers in each bus but certainly not for 2-3 persons,” said Srinivasan, Managing Director of BMTC.
He told Express that the idea of having feeder services is to facilitate the commuters of Metro train. Now it is found that there are not many passengers for feeder buses. Besides, Byappanahalli Metro Station is not a work centre because of which there are no regular commuters in these buses.

People may start using feeder services if the Metro train service is extended up to Peenya or other places where there are big chunks of workers. In view of this, the BMTC has started phasing out the feeder services at many places. It is also running feeder services from far off places like Majestic and Banashankari since many people are flocking M G Road and Byappanahalli stations for a ‘jolly ride’ in Metro trains.